Vidin-Calafat Danube bridge now fully functioning - info about the opening ceremony, taxes and fees Vidin-Calafat Danube bridge Vidin and Calafat are connected by a brand new bridge over Danube river which is now fully functioning. The opening ceremony took place on the Bulgarian side of the bridge and was attended by thousands of excited Vidin citizens and many international guests. The infrastructure project on the Bulgarian side includes design and construction of a combined (road and railway) bridge with four road lanes, one single railway track, a bicycle lane and two pavements for pedestrians and services, construction of the adjoining road and railway infrastructure which covers: new railway freight station and 7 km of new railway line, reconstruction of the existing passenger station and construction of 7 new two-level road junctions. The bridge itself includes road, railway, walking and bicycle lane. On the Romanian side the project includes the construction of 5 km of new